The well renowned Monasterboice Inn needed additional function room facilities that were required to be built in an energy efficient and low running cost manner. The 380m² function room facilities were newly built to a very high standard and elements of the existing facility refurbished and modernised.
The low energy systems employed utilised the on-site river as an energy collector via water and air source heat pumps to provide heating and cooling to the building and when combined with the building fabric resulted in an A Rated building which has achieved SEAI EXEED certification.